翻訳と辞書
Words near each other
・ Risk (comics)
・ Risk (disambiguation)
・ Risk (game)
・ RISK (graffiti artist)
・ Risk (magazine)
・ Risk (Megadeth album)
・ Risk (Paul Brandt album)
・ Risk (short story)
・ Risk (statistics)
・ Risk (Ten Shekel Shirt album)
・ Risk (Terminaator album)
・ Risk 2210 A.D.
・ Risk adjusted mortality rate
・ Risk analysis
・ Risk analysis (business)
Risk analysis (engineering)
・ Risk Analysis (journal)
・ Risk and actuarial criminology
・ Risk and Blame
・ Risk and compliance
・ Risk and Insurance Management Society
・ Risk and reward
・ Risk and Safety Statements
・ Risk and strategic consulting
・ Risk appetite
・ Risk arbitrage
・ Risk assessment
・ Risk assessment for organic swine health
・ Risk Assessment under the Sanitary and Phytosanitary Agreement
・ Risk aversion


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Risk analysis (engineering) : ウィキペディア英語版
Risk analysis (engineering)

Risk analysis is the science of risks and their probability and evaluation.
Probabilistic risk assessment is one analysis strategy usually employed in science and engineering.
==Risk analysis and the risk workshop==
Risk analysis should be performed as part of the risk management process for each project. The data of which would be based on risk discussion workshops to identify potential issues and risks ahead of time before these were to pose cost and/ or schedule negative impacts (see the article on Cost contingency for a discussion of the estimation of cost impacts).
The risk workshops should be attended by a large group ideally between 6 to 10 individuals from the various departmental functions (e.g. project manager, construction manager, site superintendent, and representatives from operations, procurement, () controls, etc.) so as to cover every risk element from different perspectives.
The outcome of the risk analysis would be the creation or review of the risk register to identify and quantify risk elements to the project and their potential impact.
Given that risk management is a continuous and iterative process, the risk workshop members would regroup on at regular intervals and project milestones to review the risk register mitigation plans, make changes to it as appropriate and following those changes re-run the risk model. By constantly monitoring risks these can be successfully mitigated resulting in a cost and schedule savings with a positive impact on the project.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Risk analysis (engineering)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.